Remove the shelves of the matters needing attention

Source: Author: Release time:2022-01-23 Reading times: 790 Second

Next, shelf factory is strict briefly to introduce the dismantling shelves of the matters needing attention, as follows:


1, shelf dismantled so as to shift the meeting to strengthen worker individual safety protection consciousness. According to the technical specification shall be strictly forbidden. Homework should be divided area, erected around a rope fence or warning signs. The ground should be set full-time personnel command, the operation personnel shall not enter the area.


2, high shelves homework personnel should wear seat belts, wearing a helmet, chaps and wear soft shoes, can be allowed on homework. It is forbidden to drink and to work in spite of illness.


3, in addition to order should follow top-down, after a first down and then take the first step down a clear principle, is to clean up outside the frame of sundry in federated eye network, erect, scaffolding, bracing, brace and small bar, bar, post, etc. And in turn, according to the principle of step a clear requirements are strictly prohibited and dismantling homework at the same time. Unsafe shelves of deformation, should be removed after reinforcement, level elevation difference should not exceed two step, while going off work should be reliable connection.


4, shelf dismantled to echo a unified command, up and down when untied the knot buttons associated with another, shall inform the other party, in case of falling.


5, the demolition of an outer layer are strictly prohibited to hit touch near the power cord, in order to prevent the accident.


6, dismantling shelves outside the frame should not be damaged doors and Windows, the article such as glass, spout, eaves tile, the ground is pumping. To strengthen the protection of the finished product, if there is damage don't dismantle, notify the foreman fixed frame, back again after dismantled should cooperate work personnel.


7, remove the materials, application of rope tied bar. Use roller under the slowly, can not throw, shipped to the city ground material to check the site, on steel pipe should be according to the specified location cannot have a pipe clamp, the day on the day of the qing dynasty. Remove the fastener or wire, plate and federated eye network centralized classification piled up.


8 and remove the material shipped to the layer to separate pile up, to alleviate the load of roof. It is forbidden to hit the floor.


Link:
Solemn statement: do not reprint the pictures of this website without permission. Violators will be prosecuted!
[statement] the purpose of reprinting online media manuscripts on this website is to spread more information. Such manuscripts do not represent the views of this website, and this website does not bear joint and several liability for the infringement of such manuscripts. Therefore, if you find that the content of this website infringes your copyright, please send the relevant content to this email【 vip@bjstb.com 】, we will delete it immediately after confirmation to ensure your copyright.

Related dynamics

  • 2023-05-30
  • 2023-05-30
  • 2023-05-22
  • 2023-05-22
  • 2023-05-22
  • 2023-05-10
Screenshot, wechat identification QR code
wechat:13701264023
(Click wechat copy to add friends)
Open wechat