Construction of chengdu warehouse need to know what data

Source:www.kldats.cn Author:凯兰德自动化立体库厂 Release time:2022-06-23 Reading times: 532 Second

Build three-dimensional warehouse need to know what data?


One, the main performance parameters:


1, inventory capacity; 2, system operation capacity; 3, information processing; 4, the surrounding logistics handling; 5, man-machine connection capacity.


Second, the need to complete an automated stereoscopic warehouse planning, should arrange the experienced staff to work in the following:


1, the demand analysis; 2, determine the unit form and specification of goods; 3, determine the unit form and specification of goods; 4, to set up the model; 5, determine the technological process, the ability to work on the warehouse system imitation calculation; 6, to determine control mode and warehouse management; 7, determine the technical parameters and configuration of the automation system; 8, determine the boundary conditions; 9, puts forward the construction and utility requirements; 10, forming a complete system of technology solutions.


Three, require companies to purchase should be clear in advance the specific requirements for equipment:


1, functional requirements; 2, the requirement of the degree of automation; 3, auxiliary requirements; 4, system scope of work and procurement scope; 5, boundary condition; 6, time limit for a project requirements; 7 and service requirements.


Four, several problems that should be paid attention to:


1, don't be the pursuit of a single equipment performance, and ignored the overall system performance.


2, the demand for different, the key is to meet the requirements of their own use. Request too low doesn't reach the need to use, requires too much could lower the system cost is too high, the stability, is hard to implement and maintain, or poor flexibility.


3, to determine the construction period to seek truth from facts, short time limit for a project may lead to a drop in the quality of system, or could not have completed project on schedule.


4, system maintenance is very important, and we maintain the right of the car, should be regularly to maintain system, make the system in good working condition, prolong the service life of system, discover the problem.


5, good for the use of automated stereoscopic warehouse, need to have highly qualified management and maintenance personnel, need to have the corresponding supporting measures.

Link:
Solemn statement: do not reprint the pictures of this website without permission. Violators will be prosecuted!
[statement] the purpose of reprinting online media manuscripts on this website is to spread more information. Such manuscripts do not represent the views of this website, and this website does not bear joint and several liability for the infringement of such manuscripts. Therefore, if you find that the content of this website infringes your copyright, please send the relevant content to this email【 vip@bjstb.com 】, we will delete it immediately after confirmation to ensure your copyright.

Related dynamics

  • 2023-05-30
  • 2023-05-30
  • 2023-05-22
  • 2023-05-22
  • 2023-05-22
  • 2023-05-10
Screenshot, wechat identification QR code
wechat:13701264023
(Click wechat copy to add friends)
Open wechat